Period of Applicability
2025-12-29 16:06 - 2026-06-30 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Major works at LPPT for Apron 10 extensions and new Apron 23 (Phase 2A). Taxiway designations changed: TWY M1 renamed R1; TWY M2 between T1 and Q1 renamed R2; TWY M2 between Q1 and M3 renamed R3. Temporary parking area 351 closed and fenced for works; markings of old infrastructure removed. All Apron 10 stands are temporarily replaced by four temporary parking positions (001–004) with pushback to taxilane A1. Taxiway K is closed. A temporary service road parallel to TWY R connects the east and west sides. Phase 2A involves execution of new M1 taxiway inside the fenced area without interference with the maneuvering area.