A0243/25
Checking status...
Taxiway Operations

Inner taxiway between J and K is not available for single engine operations for multi-engine aircraft.

2025-04-30 07:21 - 2025-07-25 04:00

Period of Applicability

2025-04-30 07:21 - 2025-07-25 04:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The inner taxiway between Taxiway J and Taxiway K is not available for single engine operations for multi-engine aircraft.

Message

TWY INNER BTN TWY J AND TWY K NO SINGLE ENG OPS AVBL FOR MULTIENGINE ACFT. REF AIP SUP 003/24, PHASE III.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0243/25 NOTAMR A0047/25
Q) LSAS/QMXLT/IV/M/A/000/999/4727N00833E005
A) LSZH B) 2504300721 C) 2507250400
E) TWY INNER BTN TWY J AND TWY K NO SINGLE ENG OPS AVBL 
FOR MULTIENGINE ACFT.
REF AIP SUP 003/24, PHASE III.
Issued at: 2025-04-30 07:21
Was this helpful?