B3050/25
Checking status...
Taxiway Operations

A2 orange centerline between TWY M and TWY G opened.

2025-04-15 13:52 - 2025-05-15 00:00

Period of Applicability

2025-04-15 13:52 - 2025-05-15 00:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The A2 orange centerline between taxiways M and G at LTAI is now opened. Refer to AIRAC amendment LTAI PRKG-2 effective 15.05.2025 for more details.

Message

A2 ORANGE CENTERLINE BTN TWY M AND TWY G OPENED. SEE AIRAC AMDT LTAI PRKG-2 15.05.2025

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B3050/25 NOTAMR B2949/25
Q) LTAA/QLXAS/IV/M  /A /000/999/3654N03048E005
A) LTAI B) 2504151352 C) 2505150000
E) A2 ORANGE CENTERLINE BTN TWY M AND TWY G OPENED.
SEE AIRAC AMDT  LTAI PRKG-2 15.05.2025
Issued at: 2025-04-15 13:53
Was this helpful?