RNAV (GNSS) STAR for Runway 16L/R not authorized; OKESA 1C transition unavailable.
2025-05-09 13:09 - 2025-06-11 21:01
Period of Applicability
2025-05-09 13:09 - 2025-06-11 21:01
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The RNAV (GNSS) STAR for Runway 16L/R is not authorized, and the OKESA 1C transition is unavailable. Pilots should not use this transition.
Message
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT ARRIVAL (STAR) NOT AUTHORIZED RNAV (GNSS) STAR RWY 16L/R (OKESA 1C, REDRA 1C, SITRU 1C, VEXOL 1C).TRANSITION OKESA 1C UNAVAILABLE; DO NOT USE.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-09 13:09
Was this helpful?