B2756/26
Checking status...
OBSTemporary Obstacles

Construction works with a vehicle near runway 24L threshold are in progress.

2026-07-09 08:30 - 2026-07-31 15:00
Duration:aggregated 7 days

Period of Applicability

2026-07-09 08:30 - 2026-07-31 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction works are in progress with a vehicle present north-east of runway 24L threshold, 830 m from runway 24L threshold, not penetrating the takeoff/landing surface of runway 06R/24L, and ATC instructions are to be advised. Schedule 0800-1500.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2756/26 NOTAMN
Q) LTBB/QFAHW/IV/BO /A /000/999/4054N02919E005
A) LTFJ B) 2607090830 C) 2607311500
D) 0800-1500
E) WIP. PRESENCE A VEHICLE AT NORTH-EAST OF RWY 24L THR AND 830M
FROM RWY 24L THR.NOT PENETRATING TAKE OFF/LANDING SURFACE OF RWY
06R/24L DUE TO CONST WORKS.
COORDINATES: 405406.21N0292102.02E
ADVISE ATC INSTRUCTIONS
Was this helpful?