B7830/25
Checking status...
Lighting Systems

Approach lighting for runway 24R is partially unserviceable due to a power failure.

2025-09-30 01:35 - 2025-11-29 15:00

Period of Applicability

2025-09-30 01:35 - 2025-11-29 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Approach lighting system for runway 24R is unserviceable between 420 m and 900 m from the threshold due to a power failure.

Message

APCH LIGHTING SYSTEM RWY 24R U/S BTN 420M-900M FROM THR. -DUE TO POWER FAILURE-

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B7830/25 NOTAMR B7815/25
Q) LTBB/QLAAS/IV/NBO/A /000/999/4054N02919E005
A) LTFJ B) 2509300135 C) 2511291500
E) APCH LIGHTING SYSTEM RWY 24R U/S BTN 420M-900M FROM THR.
-DUE TO POWER FAILURE-
Issued 27 days ago
Was this helpful?