Due to a new obstacle, changes in SID RWY 16 including climb gradient adjustments.
2025-02-20 08:40 - 2025-05-20 23:59
Period of Applicability
2025-02-20 08:40 - 2025-05-20 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Changes in Standard Instrument Departures (SID) for RWY 16 at LWSK due to new obstacle, requiring a climb gradient adjustment to 4.5%.
Message
DUE TO NEW OBSTACLE, THE FOLLOWING CHANGES OF THE STANDARD INSTRUMENT DEPARTURES (SID) RWY 16 HAVE BEEN MADE: GOSTI 2C,PEP 2D,RUGAS 2C AND SIN 2C CLIMB GRADIENT CHANGED TO READ 4,5 PERCENT REF AIP L...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-02-20 08:40
Was this helpful?