Work in progress on the south side of taxiway K between taxiways A and B.
2025-05-07 19:47 - 2025-05-11 21:00
Period of Applicability
2025-05-07 19:47 - 2025-05-11 21:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress is occurring outside the strip on the south side of taxiway K between taxiways A and B.
Message
AD WIP OUTSIDE THE STRIP ON SOUTH SIDE OF TWY K BTN TWY A AND TWY B
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-07 19:47