A0318/25
Checking status...
Runway Operations

Work in progress on the south side of runway 09/27 strip.

2025-06-27 16:33 - 2025-07-15 22:00

Period of Applicability

2025-06-27 16:33 - 2025-07-15 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress on the south side of runway 09/27 strip between taxiway A and the threshold of runway 27.

Message

RWY 09/27 STRIP WIP ON SOUTH SIDE BTN TWY A AND THR RWY 27

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0318/25 NOTAMR A0309/25
Q) MDCS/QMWHW/IV/M/A/000/999/1834N06822W005
A) MDPC B) 2506271633 C) 2507152200
E) RWY 09/27 STRIP WIP ON SOUTH SIDE BTN TWY A AND THR RWY 27
Issued at: 2025-06-27 16:33
Was this helpful?