Work in progress on the south side of runway 09/27 between taxiway A and the threshold of runway 27.
2025-05-31 22:30 - 2025-06-04 22:00
Period of Applicability
2025-05-31 22:30 - 2025-06-04 22:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress on the south side of runway 09/27 between taxiway A and the threshold of runway 27.
Message
RWY 09/27 STRIP WIP ON SOUTH SIDE BTN TWY A AND THR RWY 27
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-06-01 03:06
Was this helpful?