A0252/25
Checking status...
Runway Operations

Runway 07/25 strip construction work in progress with equipment lighted and marked.

2025-09-22 19:34 - 2025-10-12 22:00

Period of Applicability

2025-09-22 19:34 - 2025-10-12 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 07/25 strip: construction work in progress within the area bounded by 18°30′06.67″N 077°55′15.90″W – 18°30′07.63″N 077°55′13.93″W – 18°30′04.50″N 077°55′14.75″W – 18°30′05.44″N 077°55′12.55″W – 18°30′06.67″N 077°55′15.90″W; equipment is lighted and marked; elevation 3.5 m AMSL. Active SEP 22 1934–2200 and SEP 23–OCT 12 daily 1400–2200.

Message

STRIP RWY 07/25 WIP. CONST WORK WI AREA BOUND BY: 183006.67N0775515.90W - 183007.63N0775513.93W - 183004.50N0775514.75W - 183005.44N0775512.55W - 183006.67N0775515.90W. EQPT LGTD AND MARKED. ELEV 3.5M AMSL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) MKJK/QMWHW/IV/M/A/000/999/1830N07755W005
A) MKJS
B) 2509221934 C) 2510122200
D) SEP 22 1934-2200, SEP 23-OCT 12 1400-2200
E) STRIP RWY 07/25 WIP. CONST WORK WI AREA BOUND BY: 183006.67N0775515.90W - 183007.63N0775513.93W - 183004.50N0775514.75W - 183005.44N0775512.55W - 183006.67N0775515.90W. EQPT LGTD AND MARKED. ELEV 3.5M AMSL.
Issued 14 days ago