A1665/26
Checking status...
ADRunway Operations

Work in progress on south side runway strips of RWY 12L/30R between A3 and A8.

2026-02-27 16:44 - 2026-05-27 23:00
Duration:LONG3 months

Period of Applicability

2026-02-27 16:44 - 2026-05-27 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the south side runway strips of RWY 12L/30R between taxiways A3 and A8.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1665/26 NOTAMR A0395/26
Q) MMFR/QMWHW/IV/M/A/000/999/2102N08653W002
A) MMUN
B) 2602271644
C) 2605272300
E) SOUTH SIDE STRIPS RWY 12L/30R BTN TWYS A3 AND A8 WIP
Was this helpful?