Airport operations ongoing with caution due to expansion and installation work; multiple stages of work scheduled.
Period of Applicability
2025-08-08 03:36 - 2025-11-01 17:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Airport operations are ongoing but caution is advised due to the expansion of the domestic apron from gates 13 to 17 and the installation of new aircraft stands (gates 18 to 23). Delayed work schedules include: Stage 1A from June 5 to August 9, taxiway Hotel closure from July 16 to August 1, Stage 1B from June 4 to November 27, and Stage 1C from July 4 to August 6.
Message
AD OPERATIONAL BUT CTN ADZ DUE - NADI EXPANSION OF THE DOM APN FM GATES 13 -17 AND INSTL OF NEW ACFT STAND(GATES 18 -23).DELAYED WORK SKED ARE AS FOLLOWS: -STAGE 1A FM 5TH JUN TO 9TH AUG -TWY HOTEL CLOSURE FM 16TH JUL TO 1ST AUG -STAGE 1B FM 4TH JUN TO 27TH NOV -STAGE 1C FM 4TH JUL TO 6TH AUG