A1290/26
Checking status...
ADOther

Dredging with two boom-equipped dredgers is in progress in the south-east main channel.

2026-10-05 17:00 - 2026-11-07 02:00
Duration:aggregated 10 days

Period of Applicability

2026-10-05 17:00 - 2026-11-07 02:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Dredging is in progress in the south-east main channel, with two dredgers equipped with 14 m and 7 m booms. Operations take place Monday through Friday from 1700 to 0200, outside heavy-aircraft movements, and the booms are lowered for every aircraft movement.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1290/26 NOTAMN
Q) NTTT/QMWHW/IV/M/A/000/999/1733S14936W005
A) NTAA
B) 2610051700 C) 2611070200
D) MON-FRI 1700-0200
E) DREDGING WORKS IN THE SOUTH-EAST MAIN CHANNEL.
PRESENCE OF TWO DREDGERS EQUIPPED WITH 14 M AND 7 M BOOMS.
OPERATIONS CONDUCTED OUTSIDE HEAVY AIRCRAFT MOVEMENTS.
BOOMS LOWERED FOR EACH AIRCRAFT MOVEMENT.
THE FRENCH VERSION OF THIS NOTAM IS C2399/26
Was this helpful?