A0943/25
Checking status...
Runway Operations

Aerodrome operational with caution due to 60m RESA at runway ends 12/30.

2025-07-09 17:34 - 2025-10-03 05:00

Period of Applicability

2025-07-09 17:34 - 2025-10-03 05:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The aerodrome is operational, but caution is advised due to the runway end safety area (RESA) dimensions being 60 meters at runway ends 12 and 30. This information will be included in the next AIP amendment.

Message

AD OPERATIONAL BUT CTN ADZ DUE SWY DIMENSION AT RWY END 12/30 ARE 60M. AIPV SUP FOR NVSS AD-2 TO BE INCLUDED IN THE AIP AMDT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0943/25 NOTAMR A0465/25
Q) NFFF/QFAXX/IV/NBO/A/000/999/1530S16713E005
A) NVSS B) 2507091734 C) 2510030500
E) AD OPERATIONAL BUT CTN ADZ DUE SWY DIMENSION  AT RWY END 12/30 ARE
60M. AIPV SUP FOR NVSS AD-2 TO BE INCLUDED IN THE AIP AMDT.
Issued about 1 month ago
Was this helpful?