A0464/25
Checking status...
Runway Operations

Aerodrome operational but caution advised due to runway strip dimensions.

2025-04-10 07:40 - 2025-07-10 06:00

Period of Applicability

2025-04-10 07:40 - 2025-07-10 06:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The aerodrome is operational but caution is advised due to runway strip dimensions of 2000m by 150m. This information will be included in the next AIP amendment.

Message

AD OPERATIONAL BUT CTN ADZ DUE RWY STRIP DIMENSIONS ARE: 2000M BY 150M. AIPV SUP FOR NVSS AD2-51.1 TO BE INCLUDED IN THE NEXT AIP AMENDMENT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0464/25 NOTAMN
Q) NFFF/QFAXX/IV/NBO/A/000/999/1530S16713E005
A) NVSS B) 2504100740 C) 2507100600
E) AD OPERATIONAL BUT CTN ADZ DUE RWY STRIP 
DIMENSIONS ARE: 2000M BY 150M. AIPV SUP FOR NVSS 
AD2-51.1 TO BE INCLUDED IN THE NEXT AIP AMENDMENT.
Issued at: 2025-04-10 07:40
Was this helpful?