A1695/25
Checking status...
Runway Operations

Construction work in progress along both sides of runway 09/27.

2025-05-28 03:11 - 2025-08-26 14:30

Period of Applicability

2025-05-28 03:11 - 2025-08-26 14:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Construction work is in progress along both sides of runway 09/27, with machinery operating at a maximum height of 12 feet, and the distance from the runway centerline varies from 90 meters to 150 meters.

Message

CONST WORK IN PROGRESS ALONG BOTH SIDES OF RWY 09/27: DIST FM RCL: 90 M UP TO 150M , MACHINARY OPR WITH MAX HGT : 12 FT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1695/25 NOTAMR A0960/25
Q) OIIX/QMWHW/IV/M/A/000/999/
A) OIGG B) 2505280311 C) 2508261430 EST
E) CONST WORK  IN PROGRESS ALONG BOTH SIDES OF RWY 09/27:
DIST FM RCL: 90 M UP TO 150M ,
MACHINARY OPR WITH MAX HGT : 12 FT.
Issued at: 2025-05-28 03:12
Was this helpful?