A2441/25
Checking status...
Runway Operations

Construction work is in progress alongside runway 09/27 with machinery operating.

2025-08-26 04:08 - 2025-11-24 14:30

Period of Applicability

2025-08-26 04:08 - 2025-11-24 14:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Construction work is in progress along both sides of runway 09/27 from 90 m up to 150 m from the runway centerline; machinery operating with maximum height 12 ft.

Message

CONST WORK IN PROGRESS ALONG BOTH SIDES OF RWY 09/27: DIST FM RCL: 90 M UP TO 150M , MACHINARY OPR WITH MAX HGT : 12 FT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2441/25 NOTAMR A1695/25
Q) OIIX/QMWHW/IV/M/A/000/999/
A) OIGG B) 2508260408 C) 2511241430 EST
E) CONST WORK  IN PROGRESS ALONG BOTH SIDES OF RWY 09/27:
DIST FM RCL: 90 M UP TO 150M ,
MACHINARY OPR WITH MAX HGT : 12 FT.
Issued about 1 month ago
Was this helpful?