RNP procedures for RWY 26L and RWY 08R replace RNAV(GNSS) procedures.
2022-12-01 00:00 - PERM
Period of Applicability
2022-12-01 00:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The RNAV(GNSS) procedures for runways 26L and 08R are replaced by RNP procedures as specified in the AIP references. The change applies as detailed in SUP 01/22 and SUP 06/18.
Message
FLW IAC TO BE READ: 1-RNP RWY 26L INSTEAD OF RNAV(GNSS)RWY 26L 2-RNP RWY 08R INSTEAD OF RNAV(GNSS)RWY 08R REF AIP:AD 2.24.8-8,AD 2.24.8-10,SUP 01/22 AND SUP 06/18
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2022-11-30 13:10
Was this helpful?