IAC updated to RNP for RWY 01 and RWY 19 instead of RNAV(GNSS).
2022-12-01 00:00 - PERM
Period of Applicability
2022-12-01 00:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The Instrument Approach Procedures (IAC) have been updated to use RNP instead of RNAV(GNSS) for runways 01 and 19 as per the referenced AIP.
Message
FLW IAC TO BE READ: 1-RNP RWY 01 INSTEAD OF RNAV(GNSS)RWY 01 2-RNP RWY 19 INSTEAD OF RNAV(GNSS)RWY 19 REF AIP:AD 2.24.8-3,AD 2.24.8-5,SUP 01/22 AND SUP 08/18
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2022-11-30 13:49
Was this helpful?