A0425/22
Checking status...
Approach Procedures

IAC updated to RNP for RWY 01 and RWY 19 instead of RNAV(GNSS).

2022-12-01 00:00 - PERM

Period of Applicability

2022-12-01 00:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The Instrument Approach Procedures (IAC) have been updated to use RNP instead of RNAV(GNSS) for runways 01 and 19 as per the referenced AIP.

Message

FLW IAC TO BE READ: 1-RNP RWY 01 INSTEAD OF RNAV(GNSS)RWY 01 2-RNP RWY 19 INSTEAD OF RNAV(GNSS)RWY 19 REF AIP:AD 2.24.8-3,AD 2.24.8-5,SUP 01/22 AND SUP 08/18

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0425/22 NOTAMN
Q) OJAC/QPIXX/I /NBO/A /000/999/2937N03501E005
A) OJAQ B) 2212010000 C) PERM
E) FLW IAC TO BE READ:
1-RNP RWY 01 INSTEAD OF RNAV(GNSS)RWY 01 
2-RNP RWY 19 INSTEAD OF RNAV(GNSS)RWY 19
REF AIP:AD 2.24.8-3,AD 2.24.8-5,SUP 01/22 AND SUP 08/18
Issued at: 2022-11-30 13:49
Was this helpful?