A0291/26
Checking status...
OBSCrane Operations

Crane operations at construction site LCA east of the runway centerline.

2026-05-21 15:26 - 2026-06-30 21:00
Duration:2 months

Period of Applicability

2026-05-21 15:26 - 2026-06-30 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Crane operations are in progress at construction site LCA, 301 m airside, laterally east of the runway centerline, with a maximum height of 64.6 m AMSL at the listed coordinates.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0291/26 NOTAMR A0188/26
Q) OJAC/QOBCE/IV/M  /A /000/999/2937N03501E005
A) OJAQ B) 2605211526 C) 2606302100
E) CRANE OPS AT CONST SITE LCA AT 301M AIRSIDE, LATERAL EAST OF RWY
CL, MAX HIGHT 64.6M AMSL OPR AT COORD:
293641.82N 0350116.92E
293641.10N 0350120.04E
293634.40N 0350114.24E
293633.83N 0350116.91E
Was this helpful?