Closure of multiple taxiways and pads for construction at OKDI.
Period of Applicability
2025-01-29 07:24 - 2025-04-28 20:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
From 16 November 2024 to 15 November 2025, between 0300Z and 2059Z (0000-2359 local time), the following areas will be closed for construction: B2-01 through B2-15 pads, I taxiway south of C and north of A, B taxiway between I and H, and C taxiway between I and H. Tugging and staging on A2-01 through A2-12 is authorized but requires caution near the construction zones.
Message
AERODROME : UPDATE TO PREVIOUS NOTAM ON 16NOV24 -15NOV25 FM 0300Z-2059Z (0000-2359L) THE FOLOWING WILL BE CLOSED FOR CONSTRUCTION: B2-01 THROUGH B2-15 PADS, I TAXIWAY S OF C AND N OF A, B TAXIWAY BETWEEN I AND H, AND C TAXIWAY BETWEEN I AND H. TUGGING AND STAGING ON A2-01 THROUGH A2-12 IS AUTHORIZED, USE CAUTION AND DISCRETION WITH PROXIMITY TO CONSTRUCTION ZONE. POC: CW2 CASAREZ, 10 CAB AME, 318-824-2069, [email protected].