A0504/25
Checking status...
Runway Operations

Runway usage schedule for 08L/26R and 08R/26L with last pushback timing.

2025-08-13 05:06 - 2025-11-07 04:00

Period of Applicability

2025-08-13 05:06 - 2025-11-07 04:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 08L/26R will be in use from 0000 to 0400 UTC, then runway 08R/26L will be in use from 0400 to 1400 UTC, and finally runway 08L/26R will be back in use from 1400 to 2359 UTC. The last pushback will occur 20 minutes prior to the switchover.

Message

RWY 08L/26R: FM 0000 TO 0400 UTC RWY 08R/26L: FM 0400 TO 1400 UTC RWY 08L/26R: FM 1400 TO 2359 UTC LAST PUSHBACK 20 MIN PRIOR TO SWITCHOVER

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0504/25 NOTAMR A0503/25
Q) OOMM/QMRAH/IV/NBO/A/000/999/2336N05817E005
A) OOMS B) 2508130506 C) 2511070400
E) RWY 08L/26R: FM 0000 TO 0400 UTC
RWY 08R/26L: FM 0400 TO 1400 UTC
RWY 08L/26R: FM 1400 TO 2359 UTC
LAST PUSHBACK 20 MIN PRIOR TO SWITCHOVER
Issued 10 days ago
Was this helpful?