A0394/26
Checking status...
COMSurveillance Systems

ELDIS/PSR/MSSR/ADS-B remain shutdown for maintenance, with procedural control provided in Islamabad AOR.

2026-07-06 05:00 - 2026-07-06 11:00
Duration:VERY SHORT6 hours

Period of Applicability

2026-07-06 05:00 - 2026-07-06 11:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

ELDIS/PSR/MSSR/ADS-B will remain shutdown due to six-monthly scheduled maintenance. During this period, procedural control (non-radar) services shall be provided in Islamabad approach area of responsibility (AOR). Radar/ADS-B data of AIIAP Lahore, ADS-B data of Laram Top, and all VHF/EVHF will be available for the provision of air traffic services (surveillance) in ACC Islamabad AOR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0394/26 NOTAMN
Q) OPLR/QXXXX/IV/NBO/AE/000/999/3333N07250E250
A) OPIS
B) 2607060500 C) 2607061100
E) ELDIS/PSR/MSSR/ADS-B WILL REMAIN SHUTDOWN DUE TO
SIX MONTHLY SKED MAINT. DRG THIS PERIOD PROCEDURAL
CONTROL (NON-RADAR) SERVICES SHALL BE PROVIDED IN
ISLAMABAD APPROACH AREA OF RESPONSIBILITY(AOR).
RADAR/ADS-B DATA OF AIIAP LAHORE AND ADS-B DATA OF
LARAM TOP AND ALL VHF/EVHF WILL BE AVBL FOR THE
PROVISION OF AIR TRAFFIC SERVICES (SURVEILLANCE)
IN ACC ISLAMABAD AREA OF RESPONSIBILITY(AOR)
Was this helpful?