Period of Applicability
2026-10-01 00:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Qatar AIP section OTHH AD 2.8, row 2, is amended by replacing taxiway G with taxiway W1 in the taxiway K entries. Taxiway K between taxiways L and W1 is 25 m wide with a concrete surface and pavement classification rating PCR 979/R/A/W/T; taxiway K between taxiways W1 and S is 25 m wide with an asphalt surface and PCR 851/F/A/W/T.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?