6/2993
EST
Checking status...
NavApproach Procedures

NDB RWY 27 and RWY 9 procedures are changed and UNZ VOR is out of service.

2026-07-05 18:46 - 2026-08-05 18:46
Duration:2 months EST

Period of Applicability

2026-07-05 18:46 - 2026-08-05 18:46

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Benjamin Taisacan Manglona Intl, Rota Island, MP, NDB RWY 27 AMDT 4A and NDB RWY 9 AMDT 4A are changed. Radar is required for procedure entry except for aircraft equipped with a suitable RNAV system with GPS. UNZ VOR is out of service.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0048/26 NOTAMN Q) PGZU/QPICH/I/NBO/A/000/999/1410N14514E005 A) PGRO B) 2607051846 C) 2608051846 E) IAP BENJAMIN TAISACAN MANGLONA INTL, ROTA ISLAND, MP. NDB RWY 27, AMDT 4A... NDB RWY 9, AMDT 4A... RADAR REQUIRED FOR PROCEDURE ENTRY EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, UNZ VOR OUT OF SERVICE.
Was this helpful?