M1268/26
Checking status...
ADAirport Operations

Airfield closed to all air and ground operations, with possible exemptions for SAR and emergency aircraft; published timing is inconsistent.

2026-09-11 06:21 - 2026-09-21 19:00
Duration:11 days

Period of Applicability

2026-09-11 06:21 - 2026-09-21 19:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The airfield is closed to all air and ground operations from 21 September at 0230 local (published as 21 September at 1630 UTC) until normal operations resume at 0500 local (published as 17 September at 1900 UTC). All activity must cease and all personnel must leave by the closure start time. Only SAR and emergency aircraft may be exempt. The published local and UTC timing information appears inconsistent and should be verified.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1268/26 NOTAMN Q) ZUA/QXXXX/IV/NBO/A/000/999/1335N14455E005 A) PGUA B) 2609110621 C) 2609211900 E) AIRFIELD CLOSED TO ALL AIR AND GROUND OPERATIONS FROM 21 SEP 0230L (21 SEP 1630Z) ALL AFLD ACTIVITY WILL CEASE AND ALL PERSONNEL MUST EXIT AIRFIELD NLT POSTED CLOSURE START TIME. NORMAL OPERATIONS RESUME AT: 21 SEP 0500L (17 SEP 1900Z). SAR & EMERGENCY ACFT ONLY MAY BE EXEMPT.
Was this helpful?