Uneven surface in runway 09 strip due to construction work.
2025-08-31 01:12 - 2025-09-30 22:30
Period of Applicability
2025-08-31 01:12 - 2025-09-30 22:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Uneven surface exists in runway 09 strips due to construction work within a defined polygon; affected area is about 98.6 m long and 24.4 m wide located approximately 81–105.4 m south of the runway 09 reference centerline and 53–151.6 m west of taxiway B centerline (coordinates provided). Taxiway S is not affected.
Message
UNEVEN SFC EXIST IN RWY 09 STRIPS DUE TO CONST WORK, INFO AS FLW: 1.OPR AREA: 223436N/1202023E 223436N/1202027E 223435N/1202027E 223435N/1202023E (WITH A LENGTH OF 98.6M AND A WIDTH OF 24.4M, AT PSN 81M-105.4M SOUTH FM RWY 09 RCL AND 53M-151.6M WEST OF TWY B CENTER LINE) 2.TWY S NOT AFFECTED.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 18 days ago
Was this helpful?