A1643/26
Checking status...
ADTaxiway Operations

TWY B and stand 522 are closed due to construction work.

2026-05-28 22:30 - 2026-08-05 16:00
Duration:3 months

Period of Applicability

2026-05-28 22:30 - 2026-08-05 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Reference AIP SUP 27/25 dated 23 Oct 2025. Construction work at Kaohsiung Intl Airport, phase 9 is active: TWY B is closed between TWY S excluded and TWY A excluded, and stand 522 is closed.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1643/26 NOTAMN
Q) RCAA/QMXLC/IV/BO/A/000/999/2235N12021E005
A) RCKH
B) 2605282230 C) 2608051600
E) REF AIP SUP 27/25 DATED 23 OCT 2025, CONST WORK AT
KAOHSIUNG INTL AIRPORT, PHASE 9 ACT:
1.TWY B CLOSED BETWEEN TWY S (EXCLUDED) AND TWY A (EXCLUDED).
2.STAND 522 CLOSED.
Was this helpful?