A0463/25
Checking status...
Publication Updates

Permanent AIP amendments effective April 17, 2025.

2025-04-17 00:00 - 2025-04-30 23:59

Period of Applicability

2025-04-17 00:00 - 2025-04-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Permanent changes to the AIP effective from April 17, 2025, including updates to the runway 09 surface, revised PAPI position for runway 27, added administration guidelines, and revised ADC.

Message

TRIGGER NOTAM-PERM AIRAC AIP AMDT 02/25, WEF 17 APR 2025, 0000UTC. 1. INFO ON SWY 09 SFC IS ADDED. 2. PSN OF RWY 27 PAPI IS REVISED. 3. AD ADMINISTRATION GUIDELINES ADDED. 4. ADC IS REVISED.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0463/25 NOTAMN 
Q) RCAA/QFATT/IV/BO/A/000/999/2235N12021E005
A) RCKH B) 2504170000 C) 2504302359
E)
TRIGGER NOTAM-PERM AIRAC AIP AMDT 02/25, WEF 17 APR 2025, 0000UTC. 
1. INFO ON SWY 09 SFC IS ADDED.
2. PSN OF RWY 27 PAPI IS REVISED.
3. AD ADMINISTRATION GUIDELINES ADDED.
4. ADC IS REVISED.
Issued at: 2025-03-06 02:33
Was this helpful?