A0402/26
Checking status...
ADRunway Operations

Uneven surface and construction work in RWY 09 strips; TWY S not affected.

2026-02-13 08:45 - 2026-05-10 22:30
Duration:3 months

Period of Applicability

2026-02-13 08:45 - 2026-05-10 22:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Uneven surface exists in the runway 09 strips due to construction work within a defined area south of the RWY 09 centerline and west of the TWY B centerline; taxiway S is not affected.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0402/26 NOTAMR A4821/25
Q) RCAA/QMWHW/IV/M/A/000/999/2235N12021E005
A) RCKH
B) 2602130845 C) 2605102230
E) UNEVEN SFC EXIST IN RWY 09 STRIPS DUE TO CONST WORK, INFO AS FLW:
1.OPR AREA:
223436N/1202023E
223436N/1202027E
223435N/1202027E
223435N/1202023E
(WITH A LENGTH OF 98.6M AND A WIDTH OF 24.4M, AT PSN 81M-105.4M
SOUTH FM RWY 09 RCL AND 53M-151.6M WEST OF TWY B CENTER LINE)
2.TWY S NOT AFFECTED.
Was this helpful?