Uneven surface conditions on Runway 09 due to construction work.
2025-06-13 06:33 - 2025-07-31 16:00
Period of Applicability
2025-06-13 06:33 - 2025-07-31 16:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Runway 09 has uneven surface conditions due to construction work, affecting a specific area with coordinates provided. The work area is approximately 139 meters long.
Message
UNEVEN SFC EXIST IN RWY 09 STRIPS DUE TO CONST WORK, INFO AS FLW: 1.OPR AREA: 223438.02N/1202007.61E 223437.73N/1202012.19E 223433.41N/1202011.54E 223433.60N/1202007.44E (WITH A LENGTH OF 139M AND A W...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 23 days ago
Was this helpful?