Period of Applicability
2026-04-14 01:10 - 2026-07-12 16:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Wooden barricades are erected due to work in progress in the operational area defined at 22°34′31.07″N 120°21′26.35″E to 22°34′30.95″N 120°21′30.36″E, approximately 13.5 m north of taxiway S centerline with a total length of 127 m. Maximum height is 50 cm AGL with red obstacle lights on top. Aircraft shall taxi with caution.