Heavy equipment exists above the approach surface for runway 16R/34L.
2025-05-07 15:00 - 2025-05-30 20:00
Period of Applicability
2025-05-07 15:00 - 2025-05-30 20:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Heavy equipment is present above the approach surface for runway 16R/34L, affecting the area bounded by specified coordinates. The activity is scheduled from the 7th to the 9th, and from the 12th to the 30th of the month, between 1500 and 2000 UTC.
Message
HVY EQPT EXIST ABV APCH SFC FOR RWY 16R/34L 1.PSN :(1) BOUNDED BY FLW POINT(ABV APCH SFC FOR RWY 16R) 354647.13N1402157.47E 354642.71N1402200.66E 354640.04N1402155.10E 3...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-25 14:39
Was this helpful?