Heavy equipment is present above the transitional surface for runway 16R/34L.
2025-05-07 15:00 - 2025-05-30 20:00
Period of Applicability
2025-05-07 15:00 - 2025-05-30 20:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Heavy equipment exists above the transitional surface for runway 16R/34L, affecting operations during the specified times.
Message
HVY EQPT EXIST ABV TRANSITIONAL SFC FOR RWY 16R/34L 1.PSN : (1) BOUNDED BY FLW POINT 354444.55N1402314.97E 354440.30N1402318.04E 354439.31N1402315.99E 354443.56N140...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-25 14:51
Was this helpful?