Operational trial of runway status lights at New Chitose Airport.
2025-03-14 10:32 - PERM
Period of Applicability
2025-03-14 10:32 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The NOTAM announces a change in the start date for the operational trial of runway status lights at New Chitose Airport (RJCC) from 1500 UTC on March 19, 2025, to 1500 UTC on March 30, 2025.
Message
REF AIC 007/25 (CHANGE TO READ) OPERATIONAL TRIAL OF RUNWAY STATUS LIGHTS (RWSL) AT NEW CHITOSE AP/RJCC START OF VALIDITY CHANGE TO READ FROM 1500UTC 30 MAR 2025 INSTEAD OF FROM 1500UTC 19 ...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-03-14 10:33
Was this helpful?