C0945/25
Checking status...
Runway Operations

Operational trial of runway status lights at New Chitose Airport.

2025-03-14 10:32 - PERM

Period of Applicability

2025-03-14 10:32 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The NOTAM announces a change in the start date for the operational trial of runway status lights at New Chitose Airport (RJCC) from 1500 UTC on March 19, 2025, to 1500 UTC on March 30, 2025.

Message

REF AIC 007/25 (CHANGE TO READ) OPERATIONAL TRIAL OF RUNWAY STATUS LIGHTS (RWSL) AT NEW CHITOSE AP/RJCC START OF VALIDITY CHANGE TO READ FROM 1500UTC 30 MAR 2025 INSTEAD OF FROM 1500UTC 19 ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C0945/25 NOTAMN
Q) RJJJ/QXXXX/IV/M/A/000/999/4247N14142E005
A) RJCC B) 2503141032 C) PERM
E) REF AIC 007/25 (CHANGE TO READ)
OPERATIONAL TRIAL OF RUNWAY STATUS LIGHTS (RWSL)
AT NEW CHITOSE AP/RJCC
START OF VALIDITY
  CHANGE TO READ
   FROM 1500UTC 30 MAR 2025

  INSTEAD OF
   FROM 1500UTC 19 MAR 2025
Issued at: 2025-03-14 10:33
Was this helpful?