C2009/25
Checking status...
Runway Operations

Temporary runway side stripe markings installed for runways 01L/19R and 01R/19L; taxiway B4 is closed.

2025-08-08 04:22 - 2025-09-30 15:00

Period of Applicability

2025-08-08 04:22 - 2025-09-30 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Temporary runway side stripe markings have been installed for runways 01L/19R and 01R/19L, and taxiway B4 is closed. The validity of this change has been updated to September 2025 instead of August 2025.

Message

REF AIP SUP 070/25 ITEM RWY:2,3 TWY:A (CHANGE TO READ) RWY SIDE STRIPE MARKING FOR RWY 01L/19R-TEMPO INSTALLED RWY SIDE STRIPE MARKING FOR RWY 01R/19L-TEMPO INSTALLED TWY B4-CLSD END OF VALIDITY CHANGE TO READ SEP 2025 INSTEAD OF AUG 2025

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) RJJJ/QXXXX/IV/M/A/000/999/4247N14142E005
A) RJCC B) 2508080422 C) 2509301500
E) REF AIP SUP 070/25 ITEM RWY:2,3 TWY:A (CHANGE TO READ)
RWY SIDE STRIPE MARKING FOR RWY 01L/19R-TEMPO INSTALLED
RWY SIDE STRIPE MARKING FOR RWY 01R/19L-TEMPO INSTALLED
TWY B4-CLSD

END OF VALIDITY
CHANGE TO READ
SEP 2025

INSTEAD OF
AUG 2025
Issued 10 days ago
Was this helpful?