Runway 01L/19R is closed due to construction with exceptions for certain aircraft.
2025-08-13 14:05 - 2025-08-13 22:00
Period of Applicability
2025-08-13 14:05 - 2025-08-13 22:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Runway 01L/19R is closed due to construction. Exceptions are made for aircraft with prior permission at least 1 hour before and for scheduled or emergency aircraft. Taxiways are available between A2 and B2, and between A12 and B12.
Message
RWY 01L/19R-CLSD DUE TO CONST RMK/1.EXC ACFT WITH PRIOR PERMISSION AT LEAST 1HR BFR 2.EXC SKED/EMERG ACFT 3.AVBL TAX BTN TWY A2 AND B2,BTN A12 AND B12
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 5 days ago
Was this helpful?