Period of Applicability
2026-02-19 00:01 - 2027-01-31 00:01
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
US DoD procedural NOTAM amends the ILS Z or LOC Z RWY 19R instrument approach: circling minima changed (CAT AB 760-1600M 690 [700-1600M], CAT C 760-2400M 690 [700-2400M], CAT D 760-3200M 690 [700-3200M]); missed approach climb gradient changed to 5% (304 ft/NM); and a note added that a 2.5% (152 ft/NM) missed approach climb gradient is not authorized.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?