V0276/26
Checking status...
NavDeparture Procedures

BAHDA 2 SID RWY 18 L/R transitions are unavailable due to Busan VORTAC replacement.

2026-06-10 16:00 - 2026-12-31 16:00
Duration:VERY LONG7 months

Period of Applicability

2026-06-10 16:00 - 2026-12-31 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The limited SID RWY 18 L/R (BAHDA 2) has all transitions unavailable due to Busan VORTAC replacement, and radar vectors are expected after BAHDA.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0276/26 NOTAMN Q) RKRR/QPILT/I/BO/A/000/999/3510N12856E005 A) RKPK B) 2606101600 C) 2612311600 E) [US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) LIMITED SID RWY 18 L/R (BAHDA 2): ALL TRANSITIONS ARE UNAVAILABLE DUE TO BUSAN VORTAC REPLACEMENT. EXPECT RADAR VECTORS AFTER BAHDA.
Was this helpful?