V0278/26
Checking status...
NavDeparture Procedures

BEVSI 3 departure transitions are limited due to Busan VORTAC replacement.

2026-06-10 16:00 - 2026-12-31 16:00
Duration:VERY LONG7 months

Period of Applicability

2026-06-10 16:00 - 2026-12-31 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The limited BEVSI 3 departure has the Busan, Kalod, and Topax transitions unavailable due to Busan VORTAC replacement, radar vectors are expected after BEVSI, and the Masta transition remains available.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0278/26 NOTAMN Q) RKRR/QPILT/I/BO/A/000/999/3510N12856E005 A) RKPK B) 2606101600 C) 2612311600 E) [US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) LIMITED BEVSI 3 DEPARTURE: BUSAN (PSN), KALOD, AND TOPAX TRANSITIONS ARE UNAVAILABLE DUE TO BUSAN VORTAC REPLACEMENT. EXPECT RADAR VECTORS AFTER BEVSI. MASTA TRANSITION REMAINS AVAILABLE.
Was this helpful?