Period of Applicability
2026-07-01 07:13 - 2026-07-22 16:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
A temporary obstacle consisting of a tower crane and pile driver has been erected within a radius of 160.0 m centered on 372831.5N 1263113.6E, with a maximum height of 128.78 m AMSL. The obstacle penetrates the horizontal surface and is 3.9 NM east of the ARP.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?