OBSTemporary Obstacles

Temporary obstacle tower crane and pile driver erected with maximum height 136.9 m AMSL.

2026-07-06 00:24 - 2026-07-22 16:00
Duration:17 days

Period of Applicability

2026-07-06 00:24 - 2026-07-22 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A temporary obstacle consisting of a tower crane and pile driver is erected within a radius of 150.0 m centered on 372837.2N 1263109.9E, with a maximum height of 136.9 m AMSL. The obstacle penetrates the horizontal surface 3.9 NM east of the ARP.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0959/26 NOTAMR A0924/26
Q)RKRR/QOBCE/IV/M/AE/000/005/3729N12631E005
A)RKSI B)2607060024 C)2607221600
E)TEMP OBST(TOWER CRANE, PILE DRIVER) ERECTED AS FLW:
- PSN: WI RADIUS OF 150.0M CENTERED ON 372837.2N1263109.9E
- MAX HGT: 136.9M(449.1FT) AMSL
- RMK: OBST PENETRATES HORIZONTAL SURFACE(3.9NM E OF ARP)