A0787/25
Checking status...
Taxiway Operations

Changes to taxiway names and TCP names at RKSI as per AIP references.

2025-07-09 16:00 - PERM

Period of Applicability

2025-07-09 16:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

This NOTAM provides updates to the AIP regarding changes in taxiway names and transfer of control points (TCP) at RKSI, with specific references to the AIP sections for detailed changes.

Message

1. REF AIP RKSI AD 2-3, 2-21-6, 2-22-1, 2-24, 2-25, 2-27, TWY NAME CHG AS FLW : D2 TO D7, D3 TO D8, D4 TO D9, D5 TO D10 2. REF AIP RKSI AD 2-22-1, 2-24 TRANSFER OF CONTROL POINTS(TCP) NAME CHG AS FLW : 2Y TO 7Y, 3Y TO 8Y, 4Y TO 9Y, 5Y TO 10Y

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0787/25 NOTAMN  
Q) RKRR/QFAXX/IV/NBO/A/000/999/3728N12626E005
A) RKSI B) 2507091600 C) PERM
E) 1. REF AIP RKSI AD 2-3, 2-21-6, 2-22-1, 2-24, 2-25, 2-27, TWY NAME 
CHG AS FLW : D2 TO D7, D3 TO D8, D4 TO D9, D5 TO D10 

2. REF AIP RKSI AD 2-22-1, 2-24 TRANSFER OF CONTROL POINTS(TCP) NAME 
CHG AS FLW : 2Y TO 7Y, 3Y TO 8Y, 4Y TO 9Y, 5Y TO 10Y
Issued 2 days ago
Was this helpful?