H1332/26
PERM
Checking status...
ADMPublication Updates

ROAH AIP AD 2.9 updates the surface painted direction sign designation from D2 to D3.

2026-04-15 15:00 - PERM
Duration:PERMANENT

Period of Applicability

2026-04-15 15:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

ROAH AIP AD 2.9 (Surface movement guidance and markings) is corrected so the surface painted direction sign in the attached drawing reads D3 instead of D2; this change will be incorporated in the AIP amendment on 14 May 2026.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

H1332/26 NOTAMN
Q) RJJJ/QXXXX/IV/M/A/000/999/2612N12738E005
A) ROAH B) 2604151500 C) PERM
E) REF AIP PAGE ROAH AD2-11 (CHANGE TO READ)
ROAH AD 2.9 SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS
SURFACE PAINTED DIRECTION SIGN IN ATTACHED DRAWING
CHANGE TO READ
D3
INSTEAD OF
D2
RMK: THIS NOTAM WILL INCORPORATED IN AMDT ON 14 MAY 2026
Was this helpful?