Crane operations caution at specified coordinates.
2025-08-03 23:00 - 2025-09-26 07:00
Period of Applicability
2025-08-03 23:00 - 2025-09-26 07:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
A crane will be located at the specified coordinates, with a maximum height of 95 feet AGL. The crane will be flagged when raised and lowered when not in use. This operation is scheduled daily from 2300 to 0700.
Message
OBST. CAUTION: CRANE LOCATION ESTIMATED AT 26°20'14.7N 127°46'59.7E - LAT/LONG. MAX HEIGHT - 95 FT AGL. FLAGGED WHEN RAISED AND LOWERED WHEN NOT IN USE.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 22 days ago
Was this helpful?