C0206/25
Checking status...
Construction Activity

Repair work at Boton Airport.

2025-03-11 03:31 - 2025-05-11 23:59

Period of Applicability

2025-03-11 03:31 - 2025-05-11 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Construction work is ongoing at Boton Airport, specifically the repair of a concrete pavement depression at the coordinates 144745N 1201704E. Caution is advised when passing taxiway I due to the presence of construction equipment.

Message

BOTON APN WIP (REPAIR OF CONC PAVEMENT DEPRESSION AT COORD 144745N 1201704E). RMK: EXER CTN WHEN PSG TWY I DUE PRESENCE OF CONST EQPT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C0206/25 NOTAMR C0007/25
Q) RPHI/QMNHW/IV/BO /A /000/999/1448N12016E005
A) RPLB B) 2503110331 C) 2505112359 EST
E) BOTON APN WIP (REPAIR OF CONC PAVEMENT DEPRESSION AT 
COORD 144745N 1201704E).

RMK: EXER CTN WHEN PSG TWY I DUE PRESENCE OF CONST EQPT.
Issued at: 2025-03-11 03:31
Was this helpful?