Period of Applicability
2026-09-04 11:00 - 2026-12-01 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Taxiway particulars changed: TWY A is 24 m wide with a concrete surface and strength 1260/R/B/W/T; the TWY A extension is 18 m wide with a concrete surface and strength 980/R/A/W/T. TWY A from TWY K1 to F7 is concrete, while the section from TWY F7 to F8 is asphalt; both sections are 24 m wide with strength 1260/R/B/W/T.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?