B2180/26
Checking status...
ADTaxiway Operations

Portion of taxiway A is closed due to work in progress.

2026-05-19 14:48 - 2026-08-20 23:59
Duration:LONG4 months

Period of Applicability

2026-05-19 14:48 - 2026-08-20 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Portion of taxiway A between taxiway F7 and taxiway F5 is closed due to work in progress for construction of a drainage line.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2180/26 NOTAMR B0779/26
Q) RPHI/QMXLC/IV/BO /A /000/999/1512N12033E005
A) RPLC B) 2605191448 C) 2608202359
E) PORTION OF  TWY A (BTN TWY F7 AND TWY F5)
CLSD DUE WIP (CONST OF DRAINAGE LINE).