B1167/25
Checking status...
Construction Activity

Work in progress at Terminal 2 parking bays 30 and 49.

2025-03-28 09:31 - 2025-04-30 23:59

Period of Applicability

2025-03-28 09:31 - 2025-04-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is ongoing work for loading and unloading of equipment at parking bay number 30 and number 49 at Terminal 2. Caution is advised when passing near the area due to the presence of a crane with a boom height of approximately 40 meters.

Message

TERMINAL 2 ABM PRKG BAY NR 30 (WITH COORD: 143030.3N 1210041.3E) AND PRKG BAY NR 49 (WITH COORD: 143040.5N 1210043.6E) WIP (LOADING AND UNLOADING OF EQPT). RMK: EXER CTN WHEN PSG NEAR THE AREA DUE ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1167/25 NOTAMR B0667/25
Q) RPHI/QMKHW/IV/M  /A /000/999/1431N12101E005
A) RPLL B) 2503280931 C) 2504302359
E) TERMINAL 2 ABM PRKG BAY NR 30 (WITH COORD: 143030.3N 1210041.3E) 
AND PRKG BAY NR 49 (WITH COORD: 143040.5N 1210043.6E) WIP (LOADING 
AND UNLOADING OF EQPT).

RMK: EXER CTN WHEN PSG NEAR THE AREA DUE PRESENCE OF CRANE WITH BOOM
     HGT APRX 40M.
Issued at: 2025-03-28 09:31